Enterprise Sherman Extension
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Enterprise Sherman Extension is a natural gas pipeline in Texas, operated by Enterprise Products Partners. It entered service in 2009.
| Enterprise Sherman Extension | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Texas[1] |
| In service | 23 March 2009[1] |
| Technical information | |
| Length | 174 mi[1] or 173 mi[2][sources disagree] |
| Pipe size | 30", 36"[1] |
| Capacity | 950 MMcf/d additional capacity (EIA)[1] |
| Capacity added | adds 1.2 Bcf/d of incremental natural gas takeaway capacity[2] |
| Cost | $522 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Enterprise Sherman Extension is a natural gas pipeline in Texas, operated by Enterprise Products Partners. It entered service in 2009.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Enterprise Sherman Extension? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Duncan Energy Partners L.P. annual report on Form 10-K/A for the year ended December 31, 2009”. Duncan Energy Partners L.P. (filed with the SEC). 21 May 2010. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.