Equitrans CP08-74
From the ProvenHand pipeline wiki
Equitrans CP08-74 is a natural gas pipeline loop in Pennsylvania, operated by Equitrans, L.P.. It runs 1.4 miles of 12.75" pipe.
| Equitrans CP08-74 | |
|---|---|
| Also called | Line H-158[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Loop[3] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Pennsylvania[1] |
| Counties | Greene[1][3] |
| FERC docket | CP08-74[2] |
| Contractors | |
| Technical information | |
| Length | 1.4 mi[1][3] |
| Pipe size | 12.75"[1][3] |
| Cost | $1,845,354[1][3] |
| On ProvenHand | |
| Hands listed | 0 |
Equitrans CP08-74 is a natural gas pipeline loop in Pennsylvania, operated by Equitrans, L.P.. It runs 1.4 miles of 12.75" pipe.
Contractorsedit
| Contractor | Work |
|---|---|
| Meridian Energy[4] | Prime |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Equitrans CP08-74? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Notice of request under blanket authorization, Equitrans, L.P. (CP08-74)”. FERC. 28 February 2008. Retrieved 4 October 2026.
- “FERC eLibrary docket CP08-74”. Federal Energy Regulatory Commission. 15 February 2008. Retrieved 3 October 2026.
- “Equitrans, L.P.; Notice of Request Under Blanket Authorization (Docket No. CP08-74-000), Federal Register E8-4220”. Federal Energy Regulatory Commission (published in the Federal Register). 5 March 2008. Retrieved 4 October 2026.
- “Weekly status report for 6/29/08 to 7/5/08, H-158 Pipeline Project, Equitrans, L.P. (CP08-74)”. Equitrans, L.P. (filed with FERC). 10 July 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.