TP-7911 Pipeline Replacement Project
From the ProvenHand pipeline wiki
TP-7911 Pipeline Replacement Project is a pipeline replacement, operated by Equitrans, L.P.. Construction began in 2015. It runs 3 miles of 20" pipe.
| TP-7911 Pipeline Replacement Project | |
|---|---|
| General information | |
| Project type | Replacement[1] |
| Status | In service[2] |
| Owner and operator | |
| Counties | Cambria[1] |
| Construction started | 2015[4] |
| FERC docket | CP15-92[3] |
| Contractors | |
| Technical information | |
| Length | 3 mi[1] |
| Pipe size | 20"[1] |
| Cost | approximately $18.1 million (Equitrans estimate)[1] |
| On ProvenHand | |
| Hands listed | 0 |
TP-7911 Pipeline Replacement Project is a pipeline replacement, operated by Equitrans, L.P.. Construction began in 2015. It runs 3 miles of 20" pipe.
Contractorsedit
| Contractor | Work |
|---|---|
| GAI Consultants, Inc.[1] | environmental consultant (prepared the environmental report filed with the prior notice) |
Crossings
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on TP-7911 Pipeline Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Prior notice application, TP-7911 pipeline replacement (CP15-92)”. Equitrans, L.P. (filed with FERC). 19 February 2015. Retrieved 4 October 2026.
- “Weekly Status Report No. 80, January 1 to 7, 2017, TP 7911 Project (CP15-92)”. Equitrans, L.P. (filed with FERC). 12 January 2017. Retrieved 4 October 2026.
- “FERC eLibrary docket CP15-92”. Federal Energy Regulatory Commission. 19 February 2015. Retrieved 3 October 2026.
- “Weekly construction report for the period ending July 11, 2015, TP-7911 project (CP15-92)”. Equitrans, L.P. (filed with FERC). 20 July 2015. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.