ET Carthage Loop Expansion

From the ProvenHand pipeline wiki

ET Carthage Loop Expansion is a natural gas pipeline expansion in Texas, operated by Energy Transfer. It entered service in 2008. It runs 32 miles of 42" pipe.

ET Carthage Loop Expansion
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateTexas[1]
In service10 September 2008[1][2]
Technical information
Length32 mi[1][2]
Pipe size42"[1][2]
Capacity500 MMcf/d additional capacity (EIA)[1]
Capacity addedadded 500 MMcf/d of pipeline capacity from Cleburne to the Carthage Hub[2]
Cost$94 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

ET Carthage Loop Expansion is a natural gas pipeline expansion in Texas, operated by Energy Transfer. It entered service in 2008. It runs 32 miles of 42" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on ET Carthage Loop Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Energy Transfer Partners, L.P. annual report on Form 10-K for the year ended December 31, 2008”. Energy Transfer Partners, L.P. (filed with the SEC). 2 March 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.