ET Cleburne to Tolar Extension
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
ET Cleburne to Tolar Extension is a natural gas pipeline expansion in Texas, operated by Energy Transfer. It entered service in 2009. It runs 20 miles of 30" pipe.
| ET Cleburne to Tolar Extension | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Texas[1] |
| In service | 15 January 2009[1][2] |
| Technical information | |
| Length | 20 mi[1][2] |
| Pipe size | 30 in[1] or 36 in[2][sources disagree] |
| Capacity | 400 MMcf/d additional capacity (EIA)[1] |
| Capacity added | 36-inch Cleburne to Tolar, 400 MMcf/d, 20 miles, completed January 2009[2] |
| Cost | $45 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
ET Cleburne to Tolar Extension is a natural gas pipeline expansion in Texas, operated by Energy Transfer. It entered service in 2009. It runs 20 miles of 30" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on ET Cleburne to Tolar Extension? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Energy Transfer Partners, L.P. annual report on Form 10-K for the year ended December 31, 2009”. Energy Transfer Partners, L.P. (filed with the SEC). 24 February 2010. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.