ET Southeast Boosier Pipeline Phase 1

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

ET Southeast Boosier Pipeline Phase 1 is a natural gas pipeline in Texas, operated by Energy Transfer. It entered service in 2008.

ET Southeast Boosier Pipeline Phase 1
Also calledSoutheast Bossier pipeline[1]
General information
KindPipeline project[2]
Project typeNew build[2]
StatusIn service[2]
CommodityNatural gas[2]
Operator
StateTexas[2]
In service28 April 2008[1][2]
Technical information
Length165 mi[2] or 157 mi[1][sources disagree]
Pipe size24", 42"[2]
Capacity900 MMcf/d additional capacity (EIA)[2]
Cost$360 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

ET Southeast Boosier Pipeline Phase 1 is a natural gas pipeline in Texas, operated by Energy Transfer. It entered service in 2008.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on ET Southeast Boosier Pipeline Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Energy Transfer Partners, L.P. annual report on Form 10-K for the year ended December 31, 2008”. Energy Transfer Partners, L.P. (filed with the SEC). 2 March 2009. Retrieved 4 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.