ET Southeast Boosier Pipeline Phase 1 is a natural gas pipeline in Texas, operated by Energy Transfer. It entered service in 2008.
| ET Southeast Boosier Pipeline Phase 1 | |
|---|---|
| Also called | Southeast Bossier pipeline[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | New build[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| State | Texas[2] |
| In service | 28 April 2008[1][2] |
| Technical information | |
| Length | 165 mi[2] or 157 mi[1][sources disagree] |
| Pipe size | 24", 42"[2] |
| Capacity | 900 MMcf/d additional capacity (EIA)[2] |
| Cost | $360 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
ET Southeast Boosier Pipeline Phase 1 is a natural gas pipeline in Texas, operated by Energy Transfer. It entered service in 2008.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on ET Southeast Boosier Pipeline Phase 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Energy Transfer Partners, L.P. annual report on Form 10-K for the year ended December 31, 2008”. Energy Transfer Partners, L.P. (filed with the SEC). 2 March 2009. Retrieved 4 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.