ETenn Patriot Extension I
From the ProvenHand pipeline wiki
ETenn Patriot Extension I is a natural gas pipeline expansion in North Carolina and Virginia. It entered service in 2003. It runs 95 miles of 20", 24" pipe.
| ETenn Patriot Extension I | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Part of | Patriot Project[2] |
| States | North Carolina, Virginia[1] |
| In service | 19 November 2003[1] |
| FERC docket | CP01-415[1] |
| Technical information | |
| Length | 95 mi[1] |
| Pipe size | 20", 24"[1] |
| Capacity | 315 MMcf/d additional capacity (EIA)[1] |
| Cost | $225 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
ETenn Patriot Extension I is a natural gas pipeline expansion in North Carolina and Virginia. It entered service in 2003. It runs 95 miles of 20", 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on ETenn Patriot Extension I? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “East Tennessee Natural Gas, LLC Patriot Project Cost Report (CP01-415)”. East Tennessee Natural Gas, LLC (FERC eLibrary). 1 June 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.