ETenn Patriot Extension I

From the ProvenHand pipeline wiki

ETenn Patriot Extension I is a natural gas pipeline expansion in North Carolina and Virginia. It entered service in 2003. It runs 95 miles of 20", 24" pipe.

ETenn Patriot Extension I
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Part ofPatriot Project[2]
StatesNorth Carolina, Virginia[1]
In service19 November 2003[1]
FERC docketCP01-415[1]
Technical information
Length95 mi[1]
Pipe size20", 24"[1]
Capacity315 MMcf/d additional capacity (EIA)[1]
Cost$225 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

ETenn Patriot Extension I is a natural gas pipeline expansion in North Carolina and Virginia. It entered service in 2003. It runs 95 miles of 20", 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on ETenn Patriot Extension I? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “East Tennessee Natural Gas, LLC Patriot Project Cost Report (CP01-415)”. East Tennessee Natural Gas, LLC (FERC eLibrary). 1 June 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.