EUT 26-1RT Replacement Project

From the ProvenHand pipeline wiki

EUT 26-1RT Replacement Project is a pipeline replacement in Louisiana, operated by Texas Gas Transmission, LLC.

EUT 26-1RT Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1]
Owner and operator
Pipeline systemTexas Gas Transmission[3]
StateLouisiana[2]
CountiesIberia[4]
Approved30 November 2020[2]
Louisiana coastal use permitP20200258[2]
Contractors
Technical information
Pipe size26"[2]
Cost$5,797,758.00 estimated cost to complete the project under the Texas Gas reimbursement agreement with the Port of Iberia[3]
On ProvenHand
Hands listed0

EUT 26-1RT Replacement Project is a pipeline replacement in Louisiana, operated by Texas Gas Transmission, LLC.

Contractorsedit

ContractorWork
Castle Pipeline[3]removal of the abandoned 26-inch pipe beneath the Commercial Canal (estimate and start date named in the minutes)

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on EUT 26-1RT Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Louisiana OCM Coastal Permits Lines layer: segment rows for coastal use permit P20200258”. Louisiana Department of Energy and Natural Resources. Retrieved 4 October 2026.
  2. “Louisiana DENR Office of Coastal Management: Coastal Permits Lines (pipelines)”. Louisiana Department of Energy and Natural Resources. Retrieved 3 October 2026.
  3. “Port of Iberia District Board of Commissioners, special meeting minutes, July 9, 2021”. Port of Iberia District (posted by the Louisiana Division of Administration). 9 July 2021. Retrieved 4 October 2026.
  4. “Louisiana OCM Coastal Use Permit Status Report, 01 to 15 June 2021”. Louisiana Department of Natural Resources, Office of Coastal Management. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.