Evangeline Pass Expansion Project (ferc:CP20-51)
From the ProvenHand pipeline wiki
Evangeline Pass Expansion Project (ferc:CP20-51) is a pipeline expansion in Louisiana and Mississippi, operated by Southern Natural Gas Company, L.L.C.. Construction began in 2024 and the line entered service in 2025.
| Evangeline Pass Expansion Project (ferc:CP20-51) | |
|---|---|
| General information | |
| Project type | Expansion[1] |
| Status | In service[2] |
| Owner and operator | |
| Facility project | |
| States | Louisiana, Mississippi[3] |
| Counties | Louisiana: St. Bernard Mississippi: Clarke, Smith[3] |
| Approved | 25 March 2022[3][4] |
| Construction started | 22 January 2024[5] |
| In service | January 2025[2] |
| FERC docket | CP20-51[4] |
| Technical information | |
| Capacity | 1,100,000 Dth/d of firm transportation service (leased to Tennessee Gas)[3] |
| Cost | $171,412,811[3] |
| On ProvenHand | |
| Hands listed | 0 |
Evangeline Pass Expansion Project (ferc:CP20-51) is a pipeline expansion in Louisiana and Mississippi, operated by Southern Natural Gas Company, L.L.C.. Construction began in 2024 and the line entered service in 2025.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Evangeline Pass Expansion Project (ferc:CP20-51)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP20-51”. Federal Energy Regulatory Commission. 7 February 2020. Retrieved 3 October 2026.
- “Notification of Partial In-Service (MEP Meter Station), Evangeline Pass Expansion Project (CP20-51)”. Southern Natural Gas Company, L.L.C. (filed with FERC). 31 January 2025. Retrieved 4 October 2026.
- “Order Issuing Certificates and Approving Abandonment, Evangeline Pass Expansion Project (CP20-50 et al.)”. Federal Energy Regulatory Commission (eLibrary filing). 25 March 2022. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Notice of Commencement of Construction on 01/22/2024, Evangeline Pass Expansion Project (CP20-51)”. Southern Natural Gas Company, L.L.C. (filed with FERC). 2 April 2024. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.