Evangeline Pass Expansion Project (Phase 2)

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Evangeline Pass Expansion Project (Phase 2) is a natural gas pipeline expansion in Louisiana and Mississippi, operated by Southern Natural Gas Company, L.L.C.. Construction began in 2023. It runs 13 miles of 36" pipe.

Evangeline Pass Expansion Project (Phase 2)
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StatesLouisiana, Mississippi[1]
CountiesLouisiana: Plaquemines, St. Bernard
Mississippi: Clarke, Smith
[2]
Approved25 March 2022[2]
Construction startedSeptember 2023[3]
In service29 May 2025[1][4] or July 2025[5][sources disagree]
FERC docketCP20-50[1]
Technical information
Length13 mi[1]
Pipe size36"[1][2]
Capacity1100 MMcf/d additional capacity (EIA)[1] or 1,100,000 Dth/d of firm transportation[2][sources disagree]
Cost$672 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Evangeline Pass Expansion Project (Phase 2) is a natural gas pipeline expansion in Louisiana and Mississippi, operated by Southern Natural Gas Company, L.L.C.. Construction began in 2023. It runs 13 miles of 36" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1100 MMcf/d additional capacity (EIA)[1]
  • 1,100,000 Dth/d of firm transportation[2]
In service

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Evangeline Pass Expansion Project (Phase 2)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Order Issuing Certificates and Approving Abandonment, Evangeline Pass Expansion Project (CP20-50 et al.)”. Federal Energy Regulatory Commission (eLibrary filing). 25 March 2022. Retrieved 3 October 2026.
  3. “Tennessee Gas Pipeline Completes Evangeline Pass Expansion Project”. Coeus Energy (project tracker). 3 June 2025. Retrieved 3 October 2026.
  4. “Notification of In-Service, 4-Mile Loop, Evangeline Pass Expansion Project (CP20-50)”. Federal Energy Regulatory Commission (eLibrary filing). 3 June 2025. Retrieved 3 October 2026.
  5. “Kinder Morgan, Inc. second quarter 2025 results (Form 8-K exhibit 99.1)”. Kinder Morgan, Inc. (SEC Form 8-K exhibit). 16 July 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.