Evergy McNew Power Plant Delivery Project is a natural gas pipeline in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. It runs 1.6 miles of 30" pipe.

Evergy McNew Power Plant Delivery Project
General information
KindPipeline project[1]
StatusProposed[2]
CommodityNatural gas[3]
Owner and operator
Facility project
StateKansas[3]
CountiesHarvey, Reno, Stafford[3]
FERC docketCP26-572[1]
Technical information
Length1.6 mi[2][4]
Pipe size30"[2][4]
Capacityapproximately 123,000 Dth/d of firm transportation to the McNew plant[2]
Cost$75.5 million (Southern Star estimate in the application)[2]
On ProvenHand
Hands listed0

Evergy McNew Power Plant Delivery Project is a natural gas pipeline in Kansas, operated by Southern Star Central Gas Pipeline, Inc.. It runs 1.6 miles of 30" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Evergy McNew Power Plant Delivery Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-572”. Federal Energy Regulatory Commission. 31 August 2026. Retrieved 3 October 2026.
  2. “Notice of Application and Establishing Intervention Deadline, Evergy McNew Power Plant Delivery Project (CP26-572)”. Federal Energy Regulatory Commission. 15 September 2026. Retrieved 3 October 2026.
  3. “Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Evergy McNew Power Plant Delivery Project (CP26-572)”. Federal Energy Regulatory Commission. 1 October 2026. Retrieved 3 October 2026.
  4. “Application for a Certificate of Public Convenience and Necessity, Evergy McNew Power Plant Delivery Project (CP26-572), Volume I”. Southern Star Central Gas Pipeline, Inc. (filed with FERC). 31 August 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.