Extension of Time for Yorktown M&R Replacement & Reliability Project
From the ProvenHand pipeline wiki
Extension of Time for Yorktown M&R Replacement & Reliability Project is a natural gas pipeline replacement in New York, operated by Algonquin Gas Transmission, LLC. It entered service in 2022.
| Extension of Time for Yorktown M&R Replacement & Reliability Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | New York[3] |
| Counties | Westchester[3] |
| In service | 10 March 2022[2] |
| FERC dockets | CP19-13[3], CP21-15[1] |
| On ProvenHand | |
| Hands listed | 0 |
Extension of Time for Yorktown M&R Replacement & Reliability Project is a natural gas pipeline replacement in New York, operated by Algonquin Gas Transmission, LLC. It entered service in 2022.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Extension of Time for Yorktown M&R Replacement & Reliability Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP21-15”. Federal Energy Regulatory Commission. 8 December 2020. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Yorktown M&R Replacement & Reliability Project (CP19-13 and CP21-15)”. Algonquin Gas Transmission, LLC (filed with FERC). 15 March 2022. Retrieved 4 October 2026.
- “Order Amending Certificate, Algonquin Gas Transmission, LLC, Yorktown M&R Replacement & Reliability Project (CP21-15)”. Federal Energy Regulatory Commission. 25 March 2021. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.