Fairburn Expansion Project is a natural gas pipeline expansion in Georgia, operated by Southern Natural Gas Company, L.L.C.. It entered service in 2018.

Fairburn Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[2][3]
StatusIn service[2][4]
CommodityNatural gas[2][5]
Owner and operator
Facility project
StateGeorgia[1][2][5]
CountiesClayton, Cobb, Fayette, Fulton, Monroe[5]
Approved15 February 2018[1][5]
In service12 December 2018[2][4]
FERC docketCP17-46[1]
Contractors
Technical information
Length26.2 mi[1] or 19.7 mi[2][sources disagree]
Pipe size30"[2]
Capacity343.16 MMcf/d (FERC project list)[1] or 344 MMcf/d additional capacity (EIA)[2] or 343,846 dekatherms per day of firm transportation service[5][sources disagree]
Cost$240 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Fairburn Expansion Project is a natural gas pipeline expansion in Georgia, operated by Southern Natural Gas Company, L.L.C.. It entered service in 2018.

Contractorsedit

ContractorWorkScope
Progressive Pipeline Inc.[6]PrimeListed 2018 as the pipeline construction contractor

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 343.16 MMcf/d (FERC project list)[1]
  • 344 MMcf/d additional capacity (EIA)[2]
  • 343,846 dekatherms per day of firm transportation service[5]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Fairburn Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP17-46”. Federal Energy Regulatory Commission. 3 February 2017. Retrieved 3 October 2026.
  4. “Notification of In-Service, Fairburn Expansion Project (CP17-46)”. Southern Natural Gas Company, L.L.C. (filed with FERC). 18 December 2018. Retrieved 4 October 2026.
  5. “Order Issuing Certificate, Southern Natural Gas Company, L.L.C., Fairburn Expansion Project (CP17-46)”. FERC. 15 February 2018. Retrieved 4 October 2026.
  6. “Ongoing Projects: Construction Underway (Pipeline News, July 2018)”. Pipeline News. July 2018. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.