Fayetteville Shale Compression Project
From the ProvenHand pipeline wiki
Fayetteville Shale Compression Project is a facility project in Arkansas and Mississippi, operated by Texas Gas Transmission, LLC. Construction began in 2009 and the facility entered service in 2010.
| Fayetteville Shale Compression Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | New build[2] |
| Status | In service[3] |
| Owner and operator | |
| States | Arkansas, Mississippi[1] |
| Counties | Arkansas: White Mississippi: Humphreys, Washington[4] |
| Approved | 16 April 2009[1] |
| Construction started | 22 June 2009[5] |
| In service | 23 January 2010[3] |
| FERC docket | CP08-467[1] |
| Technical information | |
| Capacity added | 2300 MMcf/d (FERC project list)[1] |
| Units added | 2 (turbine, 13,330 hp each (Bald Knob Compressor Station)); 1 (turbine, 13,330 hp (Isola Compressor Station))[4] |
| Horsepower added | 39,990 hp[1] |
| On ProvenHand | |
| Hands listed | 0 |
Fayetteville Shale Compression Project is a facility project in Arkansas and Mississippi, operated by Texas Gas Transmission, LLC. Construction began in 2009 and the facility entered service in 2010.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Fayetteville Shale Compression Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP08-467”. Federal Energy Regulatory Commission. 2 September 2008. Retrieved 3 October 2026.
- “In-Service Notification for the Isola Compressor Station (CP08-467)”. Texas Gas Transmission, LLC (filed with FERC). 26 January 2010. Retrieved 4 October 2026.
- “Fayetteville Shale Compression Project Implementation Plan (CP08-467)”. Texas Gas Transmission, LLC (filed with FERC). 15 May 2009. Retrieved 4 October 2026.
- “Notice of beginning of construction, Fayetteville Shale Compression Project (CP08-467)”. Texas Gas Transmission, LLC (filed with FERC). 24 June 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.