Fayetteville/Greenville Expansion Project is a pipeline project in Arkansas and Mississippi, operated by Texas Gas Transmission, LLC. It runs 262.6 miles.

Fayetteville/Greenville Expansion Project
General information
KindPipeline project[1]
StatusIn service[2]
Owner and operator
Facility project
StatesArkansas, Mississippi[3]
Approved2 May 2008[3]
FERC docketCP07-417[3]
FERC pre-filing docketPF07-2[1]
Technical information
Length262.6 mi[3]
Capacity1609 MMcf/d (FERC project list)[3]
CostTotal 1,044,299.81 in a table headed ($ in thousands), actual costs plus forecast to complete (Exhibit K estimate 821,10[4]
On ProvenHand
Hands listed0

Fayetteville/Greenville Expansion Project is a pipeline project in Arkansas and Mississippi, operated by Texas Gas Transmission, LLC. It runs 262.6 miles.

Spreads

Spread
Spread 1-A[5]
Spread 1-B[5]
Spread 2[6]
Spread 3[6]
Spread 4[7]
Spread 5[7]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Fayetteville/Greenville Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP07-417”. Federal Energy Regulatory Commission. 11 July 2007. Retrieved 3 October 2026.
  2. “Notice of Commencement of Service on Certain Spread 4 Facilities and the Greenville Compressor Station Upgrades (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 5 March 2009. Retrieved 4 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Post-Construction Cost Statement, Fayetteville/Greenville Expansion Project (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 9 October 2009. Retrieved 4 October 2026.
  5. “Request for Written Authorization to Place Phase I Facilities (Fayetteville Lateral Spreads 1-A and 1-B) In Service (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 17 December 2008. Retrieved 4 October 2026.
  6. “Request for Written Authorization to Place Spread 2 and Spread 3 Facilities of the Fayetteville Lateral Into Service (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 19 March 2009. Retrieved 4 October 2026.
  7. “Request for Written Authorization to Place Certain Spread 4 Facilities and Spread 5 Facilities of the Greenville Lateral Into Service (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 4 March 2009. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.