Fayetteville/Greenville Expansion Project is a pipeline project in Arkansas and Mississippi, operated by Texas Gas Transmission, LLC. It runs 262.6 miles.
| Fayetteville/Greenville Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | In service[2] |
| Owner and operator | |
| Facility project | |
| States | Arkansas, Mississippi[3] |
| Approved | 2 May 2008[3] |
| FERC docket | CP07-417[3] |
| FERC pre-filing docket | PF07-2[1] |
| Technical information | |
| Length | 262.6 mi[3] |
| Capacity | 1609 MMcf/d (FERC project list)[3] |
| Cost | Total 1,044,299.81 in a table headed ($ in thousands), actual costs plus forecast to complete (Exhibit K estimate 821,10[4] |
| On ProvenHand | |
| Hands listed | 0 |
Fayetteville/Greenville Expansion Project is a pipeline project in Arkansas and Mississippi, operated by Texas Gas Transmission, LLC. It runs 262.6 miles.
Spreads
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Fayetteville/Greenville Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP07-417”. Federal Energy Regulatory Commission. 11 July 2007. Retrieved 3 October 2026.
- “Notice of Commencement of Service on Certain Spread 4 Facilities and the Greenville Compressor Station Upgrades (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 5 March 2009. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Post-Construction Cost Statement, Fayetteville/Greenville Expansion Project (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 9 October 2009. Retrieved 4 October 2026.
- “Request for Written Authorization to Place Phase I Facilities (Fayetteville Lateral Spreads 1-A and 1-B) In Service (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 17 December 2008. Retrieved 4 October 2026.
- “Request for Written Authorization to Place Spread 2 and Spread 3 Facilities of the Fayetteville Lateral Into Service (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 19 March 2009. Retrieved 4 October 2026.
- “Request for Written Authorization to Place Certain Spread 4 Facilities and Spread 5 Facilities of the Greenville Lateral Into Service (CP07-417)”. Texas Gas Transmission, LLC (filed with FERC). 4 March 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.