Feeder Line Replacement - U.S. 89

From the ProvenHand pipeline wiki

Feeder Line Replacement - U.S. 89 is a pipeline replacement in Utah. It runs 18 miles of 12" pipe.

Feeder Line Replacement - U.S. 89
General information
KindPipeline project[1]
Project typeReplacement[1]
StateUtah[1]
Contractors
Technical information
Length18 mi[1]
Pipe size12"[1]
On ProvenHand
Hands listed0

Feeder Line Replacement - U.S. 89 is a pipeline replacement in Utah. It runs 18 miles of 12" pipe.

Contractorsedit

ContractorWorkScope
Canyon Pipeline Construction, Inc.[1]PrimeReplaced about 18 miles of high-pressure feeder line with 12-inch steel along U.S. 89 from Alpine to Provo, UT; night work, movable barriers and directional boring; top-three finalist for a UDOT award

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Feeder Line Replacement - U.S. 89? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Gas Pipeline Construction Projects | Canyon Pipeline”. Canyon Pipeline Construction, Inc. Archived from the original on 7 January 2019. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.