FGT Alabama Power Lateral

From the ProvenHand pipeline wiki

FGT Alabama Power Lateral is a natural gas pipeline lateral in Alabama. It entered service in 1998. It runs 1 miles of 12" pipe.

FGT Alabama Power Lateral
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[1]
CommodityNatural gas[1]
StateAlabama[1]
In serviceDecember 1998[1]
FERC docketCP98-249[1]
Technical information
Length1 mi[1]
Pipe size12"[1]
Capacity62 MMcf/d additional capacity (EIA)[1]
Cost$0.77 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

FGT Alabama Power Lateral is a natural gas pipeline lateral in Alabama. It entered service in 1998. It runs 1 miles of 12" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on FGT Alabama Power Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.