FGT Alabama Power Lateral
From the ProvenHand pipeline wiki
FGT Alabama Power Lateral is a natural gas pipeline lateral in Alabama. It entered service in 1998. It runs 1 miles of 12" pipe.
| FGT Alabama Power Lateral | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| State | Alabama[1] |
| In service | December 1998[1] |
| FERC docket | CP98-249[1] |
| Technical information | |
| Length | 1 mi[1] |
| Pipe size | 12"[1] |
| Capacity | 62 MMcf/d additional capacity (EIA)[1] |
| Cost | $0.77 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
FGT Alabama Power Lateral is a natural gas pipeline lateral in Alabama. It entered service in 1998. It runs 1 miles of 12" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on FGT Alabama Power Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.