FGT Phase V Stage 4
From the ProvenHand pipeline wiki
FGT Phase V Stage 4 is a natural gas pipeline expansion in Alabama, Florida and Mississippi. It entered service in 2003. It runs 136 miles of 16", 24", 36" pipe.
| FGT Phase V Stage 4 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| States | Alabama, Florida, Mississippi[1] |
| In service | May 2003[1] |
| FERC docket | CP00-40[1] |
| Technical information | |
| Length | 136 mi[1] |
| Pipe size | 16", 24", 36"[1] |
| Capacity | 130 MMcf/d additional capacity (EIA)[1] |
| Cost | $132 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
FGT Phase V Stage 4 is a natural gas pipeline expansion in Alabama, Florida and Mississippi. It entered service in 2003. It runs 136 miles of 16", 24", 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on FGT Phase V Stage 4? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.