FGT Turkey Point Lateral is a natural gas pipeline lateral in Florida, operated by Florida Gas Transmission Company, LLC. It runs 0.3 miles of 24" pipe.
| FGT Turkey Point Lateral | |
|---|---|
| Also called | Turkey Point Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Lateral[2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2][4] |
| Owner and operator | |
| State | Florida[2][4] |
| Counties | Miami-Dade[4] |
| Approved | 20 June 2005[4] |
| In service | December 2006[2] or 1 December 2006[3][sources disagree] |
| FERC docket | CP05-64[2] |
| Technical information | |
| Length | 0.3 mi[2] |
| Pipe size | 24 in[2] or 18 in[4][sources disagree] |
| Capacity | 100 MMcf/d additional capacity (EIA)[2] |
| Units added | 2 (electric motor, 8,500 hp each)[4] |
| Horsepower added | 17,000 hp[4] |
| Cost | $19.6 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
FGT Turkey Point Lateral is a natural gas pipeline lateral in Florida, operated by Florida Gas Transmission Company, LLC. It runs 0.3 miles of 24" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on FGT Turkey Point Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP05-64”. Federal Energy Regulatory Commission. 1 February 2005. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notification that the Turkey Point Project was placed in service and the authorized abandonment occurred 12/1/06 (CP05-64)”. Federal Energy Regulatory Commission. 8 December 2006. Retrieved 4 October 2026.
- “Order issuing certificate and granting abandonment authority, Florida Gas Transmission (Turkey Point Project, CP05-64)”. Federal Energy Regulatory Commission. 20 June 2005. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.