FGT Western Division Project is a natural gas pipeline expansion, operated by Florida Gas Trans Co. Construction began in 2017 and the line entered service in 2018. It runs 1 miles of 8", 36" pipe.

FGT Western Division Project
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
OperatorFlorida Gas Trans Co[1]
Operator
Owner and operator
StatesAL, MS[1] or AL, FL[3][sources disagree]
CountiesAlabama: Escambia
Florida: Santa Rosa
[3]
Construction startedJuly 2017[4]
In service25 October 2018[1]
FERC docketCP17-23[1]
Technical information
Length1 mi[1]
Pipe size8", 36"[1]
Capacity69 MMcf/d additional capacity (EIA)[1]
Capacity added68,500 million British thermal units per day of natural gas to FPU and Ascend[3]
Cost$10.7 million (EIA estimate; no dollar year given)[1] or approximately $10,655,060[3][sources disagree]
On ProvenHand
Hands listed0

FGT Western Division Project is a natural gas pipeline expansion, operated by Florida Gas Trans Co. Construction began in 2017 and the line entered service in 2018. It runs 1 miles of 8", 36" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $10.7 million (EIA estimate; no dollar year given)[1]
  • approximately $10,655,060[3]
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on FGT Western Division Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP17-23”. Federal Energy Regulatory Commission. 30 November 2015. Retrieved 3 October 2026.
  3. “Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization (Docket No. CP17-23-000), Federal Register 2016-31659”. Federal Energy Regulatory Commission (published in the Federal Register). 30 December 2016. Retrieved 4 October 2026.
  4. “Weekly Environmental Status Report No. 1, Western Division Project (CP17-23), July 17 to July 23, 2017”. Florida Gas Transmission Company, LLC (filed with FERC). 25 July 2017. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.