Fields Point Liquefaction Project
From the ProvenHand pipeline wiki
Fields Point Liquefaction Project is a natural gas facility project in Rhode Island, operated by National Grid LNG, L.P.. Construction began in 2019 and the facility entered service in 2023.
| Fields Point Liquefaction Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | New build[2] |
| Status | In service[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Rhode Island[2] |
| Approved | 17 October 2018[2] |
| Construction started | 18 March 2019[4] |
| In service | 25 May 2023[3][5] |
| FERC docket | CP16-121[1] |
| FERC pre-filing docket | PF15-28[1] |
| Contractors | |
| Technical information | |
| Capacity added | 20 million standard cubic feet per day[2] |
| Cost | $428,289,003 actual and forecast total (Aug 2023); certificate-stage estimate $390,829,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Fields Point Liquefaction Project is a natural gas facility project in Rhode Island, operated by National Grid LNG, L.P.. Construction began in 2019 and the facility entered service in 2023.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Kiewit Corporation[4][6][7] | Prime | EPC contractor for the gas pretreatment and liquefaction plant (FERC staff: EPC manager): engineered, procured, constructed, commissioned and started up the plant; mobilized to site 2019-03-18 | from 18 March 2019 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Fields Point Liquefaction Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP16-121”. Federal Energy Regulatory Commission. 1 April 2016. Retrieved 3 October 2026.
- “Order Issuing Certificate, National Grid LNG LLC, Fields Point Liquefaction Project (CP16-121)”. Federal Energy Regulatory Commission. 17 October 2018. Retrieved 3 October 2026.
- “Post-Construction Cost Report, Fields Point Liquefaction Project (CP16-121)”. National Grid LNG LLC (filed with FERC). 25 October 2023. Retrieved 3 October 2026.
- “Monthly Status Report for March 2019, Fields Point Liquefaction Project (CP16-121)”. National Grid LNG LLC (filed with FERC). 1 April 2019. Retrieved 3 October 2026.
- “Post-Construction Noise Survey Report, Fields Point Liquefaction Project (CP16-121)”. National Grid LNG LLC (filed with FERC). 18 June 2024. Retrieved 3 October 2026.
- “Virtual Construction Inspection Report (January 14, 2021 inspection), Fields Point Liquefaction Project (CP16-121)”. Federal Energy Regulatory Commission staff. 16 March 2021. Retrieved 3 October 2026.
- “Fields Point LNG Facility, Providence, Rhode Island (project page)”. Kiewit Corporation. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.