Fitchburg Expansion Project is a natural gas pipeline expansion in Massachusetts, operated by Tennessee Gas Pipeline Company, L.L.C.. It was built and entered service in 2009. It runs 5.2 miles of 12" pipe.

Fitchburg Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateMassachusetts[1]
Approved27 October 2008[3]
Construction started20 May 2009[4]
In service28 August 2009[1]
FERC docketCP08-63[1]
Technical information
Length5.2 mi[1]
Pipe size12"[1]
Capacity12.3 MMcf/d additional capacity (EIA)[1]
Cost$23 million (EIA estimate; no dollar year given)[1] or approximately $10.7 million estimated cost[3][sources disagree]
On ProvenHand
Hands listed0

Fitchburg Expansion Project is a natural gas pipeline expansion in Massachusetts, operated by Tennessee Gas Pipeline Company, L.L.C.. It was built and entered service in 2009. It runs 5.2 miles of 12" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $23 million (EIA estimate; no dollar year given)[1]
  • approximately $10.7 million estimated cost[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Fitchburg Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP08-63”. Federal Energy Regulatory Commission. 24 January 2008. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Tennessee Gas Pipeline Company, Fitchburg Expansion Project (CP08-63)”. Federal Energy Regulatory Commission. 27 October 2008. Retrieved 4 October 2026.
  4. “Weekly Status Report, May 18-25, 2009, Fitchburg Expansion Project (CP08-63)”. Tennessee Gas Pipeline Company (filed with FERC). 5 June 2009. Retrieved 4 October 2026.