FL Turnpike Enterprise SR 91 Widening is a pipeline replacement in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2007 and the line entered service in 2008.
| FL Turnpike Enterprise SR 91 Widening | |
|---|---|
| Also called | SR91-Pipeline Relocation Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Replacement[1] |
| Status | In service[3] |
| Owner and operator | |
| State | Florida[2] |
| Counties | Broward[4] |
| Approved | 3 May 2006[2] |
| Construction started | 25 April 2007[5] |
| In service | 20 March 2008[3] |
| FERC docket | CP06-9[2] |
| FERC pre-filing docket | PF05-13[2] |
| Technical information | |
| Length | 26 mi[2] or 11.2 mi[4][sources disagree] |
| Pipe size | 36"[4] |
| Cost | $110,240,221 estimated cost of abandoning the old lines and building the new facilities (application, Oct. 2005)[4] |
| On ProvenHand | |
| Hands listed | 0 |
FL Turnpike Enterprise SR 91 Widening is a pipeline replacement in Florida, operated by Florida Gas Transmission Company, LLC. Construction began in 2007 and the line entered service in 2008.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on FL Turnpike Enterprise SR 91 Widening? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP06-9”. Federal Energy Regulatory Commission. 20 October 2005. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Notification of Commencement of Service, SR 91 Relocation Project (CP06-9)”. Florida Gas Transmission Company, LLC (filed with FERC). 25 March 2008. Retrieved 4 October 2026.
- “Order Authorizing Abandonment and Issuing Certificate, Florida Gas Transmission Company (CP06-9)”. Federal Energy Regulatory Commission. 3 May 2006. Retrieved 4 October 2026.
- “Notice that construction commenced, State Road 91 Relocation Project (CP06-9), eLibrary record”. Florida Gas Transmission Company (filed with FERC). 26 April 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.