Florida Gas Transmission CP08-427
From the ProvenHand pipeline wiki
Florida Gas Transmission CP08-427 is a pipeline project, operated by Florida Gas Transmission Company, LLC.
| Florida Gas Transmission CP08-427 | |
|---|---|
| General information | |
| Owner and operator | |
| Counties | Orange[2] |
| FERC docket | CP08-427[1] |
| Technical information | |
| Capacity | flow capability of up to 250 MMcf/d[2] |
| Cost | $484,065 (FGT estimate)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Florida Gas Transmission CP08-427 is a pipeline project, operated by Florida Gas Transmission Company, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Florida Gas Transmission CP08-427? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP08-427”. Federal Energy Regulatory Commission. 18 June 2008. Retrieved 3 October 2026.
- “Florida Gas Transmission Company, LLC; Notice of Request Under Blanket Authorization (Docket No. CP08-427-000), Federal Register E8-15090”. Federal Energy Regulatory Commission (published in the Federal Register). 3 July 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.