Florida Gas Transmission Fort Myers Lateral Relocation Project

From the ProvenHand pipeline wiki

Florida Gas Transmission Fort Myers Lateral Relocation Project is a natural gas pipeline lateral in Florida, operated by Florida Gas Transmission Company, LLC. It runs 1.5 miles of 26" pipe.

Florida Gas Transmission Fort Myers Lateral Relocation Project
Also calledFort Myers Lateral Relocation Project[1]
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[2]
CommodityNatural gas[3]
Owner and operator
StateFlorida[3]
CountiesCharlotte, Collier, Lee[3]
FERC docketsCP23-482[4], CP24-9[1]
Technical information
Length1.5 mi[3]
Pipe size26"[3]
Cost$15,600,000[3]
On ProvenHand
Hands listed0

Florida Gas Transmission Fort Myers Lateral Relocation Project is a natural gas pipeline lateral in Florida, operated by Florida Gas Transmission Company, LLC. It runs 1.5 miles of 26" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Florida Gas Transmission Fort Myers Lateral Relocation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP24-9”. Federal Energy Regulatory Commission. 19 October 2023. Retrieved 3 October 2026.
  2. “Weekly Environmental Status Report No. 14, final (April 2024), Fort Myers Lateral Relocation Project (CP23-482)”. Florida Gas Transmission Company, LLC (filed with FERC). 9 May 2024. Retrieved 4 October 2026.
  3. “Environmental Assessment Report, Fort Myers Lateral Relocation Project (CP23-482)”. FERC. 21 July 2023. Retrieved 4 October 2026.
  4. “FERC eLibrary docket CP23-482”. Federal Energy Regulatory Commission. 17 May 2023. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.