Florida Gas Transmission Phase 9 Expansion
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Florida Gas Transmission Phase 9 Expansion is a natural gas pipeline expansion, operated by Florida Gas Transmission Company, LLC.
| Florida Gas Transmission Phase 9 Expansion | |
|---|---|
| Also called | Phase IX Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[2] |
| Status | Announced[2] |
| Commodity | Natural gas[2] |
| Operator | |
| State | FL[2] or AL, FL, MS[1][sources disagree] |
| Counties | Florida: Gadsden, Hillsborough, Holmes, Jefferson, Lafayette, Liberty, Madison, Putnam, Santa Rosa, Taylor, Union, Walton Mississippi: George, Greene[3] |
| FERC docket | CP26-578[1] |
| Technical information | |
| Length | 82 mi[2] or 95 mi[1][sources disagree] |
| Capacity | 550 MMcf/d additional capacity (EIA)[2] or up to 526 million cubic feet per day[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Florida Gas Transmission Phase 9 Expansion is a natural gas pipeline expansion, operated by Florida Gas Transmission Company, LLC.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Length | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Florida Gas Transmission Phase 9 Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Abbreviated Application for a Certificate of Public Convenience and Necessity, Florida Gas Transmission Phase IX Project (CP26-578)”. Federal Energy Regulatory Commission (eLibrary filing). 14 September 2026. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Florida Gas Transmission Phase IX Natural Gas Expansion Project fact sheet (updated June 2, 2026)”. Energy Transfer. 2 June 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.