Florida Gas Transmission Phase IX Project
From the ProvenHand pipeline wiki
Florida Gas Transmission Phase IX Project is a natural gas pipeline expansion in Alabama, Florida and Mississippi, operated by Florida Gas Transmission Company, LLC. It runs 94.6 miles of 30", 36", 42" pipe.
| Florida Gas Transmission Phase IX Project | |
|---|---|
| Also called | FGT Phase IX Project[1], Phase IX Natural Gas Expansion Project[2] |
| General information | |
| Kind | Pipeline project[3] |
| Project type | Expansion[2] |
| Status | Proposed[4] |
| Commodity | Natural gas[4] |
| Owner and operator | |
| Facility projects |
|
| States | Alabama, Florida, Mississippi[4] |
| Counties | Alabama: Mobile Florida: Bradford, Citrus, DeSoto, Gadsden, Gilchrist, Hillsborough, Holmes, Jefferson, Lafayette, Lake, Liberty, Madison, Marion, Orange, Palm Beach, Putnam, Santa Rosa, St. Lucie, Taylor, Union, Walton, Washington Mississippi: George, Greene[1] |
| FERC docket | CP26-578[3] |
| Technical information | |
| Length | 94.6 mi[1] |
| Pipe size | 30", 36", 42"[1][2] |
| Capacity | 526,750 MMBtu/d (designed capacity)[4] |
| Cost | $1,220,215,365 (FGT estimate of total project cost)[4] |
| On ProvenHand | |
| Hands listed | 0 |
Florida Gas Transmission Phase IX Project is a natural gas pipeline expansion in Alabama, Florida and Mississippi, operated by Florida Gas Transmission Company, LLC. It runs 94.6 miles of 30", 36", 42" pipe.
Spreads
Crossings
| Feature | Method |
|---|---|
| Alligator Branch (Loop 1 HDD #1, MP 161.25-161.46)[1] | HDD |
| Aucilla River (Loop 5 HDD #1, MP 451.94-452.18)[1] | HDD |
| Bridge Creek (Loop 3 HDD #4)[1] | HDD |
| East Fork Big Coldwater Creek (Loop 2 HDD #2, MP 256.38-256.72)[1] | HDD |
| Econfina River (Loop 5 HDD #2, MP 460.17-460.45)[1] | HDD |
| N County Road 315 (Loop 8 HDD #1, MP 583.90-584.21)[1] | HDD |
| N US Highway 301 (Loop 9 HDD #1, MP 157.06-157.31)[1] | HDD |
| Pond and forested wetland W001SA015 (Loop 2 HDD #1, MP 251.44-251.69)[1] | HDD |
| SW County 239 road crossing (Loop 7 HDD #1, MP 539.26-539.56)[1] | HDD |
| State Road 20 (Loop 8 HDD #2, MP 584.50-584.79)[1] | HDD |
| Telogia Creek (Loop 4 HDD #1, MP 387.55-388.06)[1] | HDD |
| West Sandy Creek (Loop 3 HDD #3)[1] | HDD |
| Wetland W002WA010 and pond S002WWA026 (Loop 3 HDD #1)[1] | HDD |
| Wetland W002WA017 and State Highway 83 (Loop 3 HDD #2)[1] | HDD |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Florida Gas Transmission Phase IX Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Abbreviated Application for a Certificate of Public Convenience and Necessity, Phase IX Project (CP26-578), Volume I Part 1 (application, exhibits, Resource Reports)”. Florida Gas Transmission Company, LLC (filed with FERC). 9 September 2026. Retrieved 3 October 2026.
- “Florida Gas Transmission Phase IX Natural Gas Expansion Project fact sheet (updated June 2, 2026)”. Energy Transfer. 2 June 2026. Retrieved 3 October 2026.
- “FERC eLibrary docket CP26-578”. Federal Energy Regulatory Commission. 9 September 2026. Retrieved 3 October 2026.
- “Notice of Application and Establishing Intervention Deadline, Phase IX Project (CP26-578)”. Federal Energy Regulatory Commission. 23 September 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.