Florida Gas Transmission Phase VIII Expansion

From the ProvenHand pipeline wiki

Florida Gas Transmission Phase VIII Expansion is a natural gas pipeline in Alabama and Florida, operated by Florida Gas Transmission Company. It entered service in 2011. It runs 483 miles of 24", 30", 36", 42" pipe.[1]

Florida Gas Transmission Phase VIII Expansion
Also calledFGT Phase VIII, Phase VIII Expansion, Florida Gas Phase VIII
General information
CommodityNatural gas
OperatorFlorida Gas Transmission Company
StatesAlabama, Florida
In service2011
Contractors
  • Price Gregory
Technical information
Length483 mi
Pipe size24", 30", 36", 42"
On ProvenHand
Hands listed0

Florida Gas Transmission Phase VIII Expansion is a natural gas pipeline in Alabama and Florida, operated by Florida Gas Transmission Company. It entered service in 2011. It runs 483 miles of 24", 30", 36", 42" pipe.[1]

Contractorsedit

ContractorScope
Price Gregory[2]Loops 1 and 2 (100.3 km, 36- and 42-inch, AL and FL) and Loops 3 and 4 (138.9 km, 36-inch, FL)

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Florida Gas Transmission Phase VIII Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. eia.gov · EIA-NaturalGasPipelineProjects.xlsx
  2. rmsweldingsystems.com

This pipeline article is a stub. You can help ProvenHand by expanding it.