Florida Gas Transmission South Central Louisiana Project

From the ProvenHand pipeline wiki

Florida Gas Transmission South Central Louisiana Project is a natural gas pipeline expansion in Louisiana, operated by Florida Gas Transmission Company, LLC. Construction began in 2026.

Florida Gas Transmission South Central Louisiana Project
Also calledSouth Central Louisiana[1]
General information
KindPipeline project[2]
Project typeExpansion[1]
StatusUnder construction[1]
CommodityNatural gas[1]
Owner and operator
StateLouisiana[1][3][4]
CountiesEast Baton Rouge, St. Landry[5]
Approved24 November 2025[3][5]
Construction started23 February 2026[6]
FERC docketCP25-30[2]
Technical information
Capacity75 MMcf/d (FERC project list)[1][3][4]
Units added1 (gas-fired compressor unit, 15,900 hp each)[5]
Cost$43.4 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Florida Gas Transmission South Central Louisiana Project is a natural gas pipeline expansion in Louisiana, operated by Florida Gas Transmission Company, LLC. Construction began in 2026.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Florida Gas Transmission South Central Louisiana Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP25-30”. Federal Energy Regulatory Commission. 13 December 2024. Retrieved 3 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
  5. “Order Issuing Certificate, Florida Gas Transmission Company, LLC, South Central Louisiana Project (CP25-30)”. Federal Energy Regulatory Commission. 24 November 2025. Retrieved 3 October 2026.
  6. “Monthly Status Report No. 1 (February 2026), South Central Louisiana Project (CP25-30)”. Florida Gas Transmission Company, LLC (filed with FERC). 6 March 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.