Florida Gas Transmission South Louisiana Project is a natural gas facility project in Louisiana and Mississippi, operated by Florida Gas Transmission Company, LLC. Construction began in 2024 and the facility entered service in 2025.
| Florida Gas Transmission South Louisiana Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Added units[2] |
| Status | In service[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Louisiana, Mississippi[4] |
| Counties | Louisiana: East Baton Rouge, St. Landry, Washington Mississippi: Perry[5] |
| Approved | 25 April 2024[4][6] |
| Construction started | 27 June 2024[7] |
| In service | 17 March 2025[3] |
| FERC docket | CP23-492[1] |
| Technical information | |
| Capacity added | 100 MMcf/d (FERC project list)[4] |
| Units added | 1 × Solar Taurus 60 (gas turbine, 7,700 hp each); 1 × Solar Mars 100 (gas turbine, 15,900 hp each)[2] |
| Horsepower added | 26,000 hp[4] |
| Cost | approximately $74.9 Million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Florida Gas Transmission South Louisiana Project is a natural gas facility project in Louisiana and Mississippi, operated by Florida Gas Transmission Company, LLC. Construction began in 2024 and the facility entered service in 2025.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Florida Gas Transmission South Louisiana Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-492”. Federal Energy Regulatory Commission. 2 June 2023. Retrieved 3 October 2026.
- “Abbreviated Application for a Certificate, South Louisiana Project (CP23-492)”. Florida Gas Transmission Company, LLC (filed with FERC). 2 June 2023. Retrieved 3 October 2026.
- “Notification of commencement of service at Compressor Station 8, South Louisiana Project (CP23-492)”. Florida Gas Transmission Company, LLC (filed with FERC). 18 March 2025. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Environmental Assessment, South Louisiana Project (CP23-492)”. FERC Office of Energy Projects. 15 December 2023. Retrieved 3 October 2026.
- “Implementation Plan, South Louisiana Project (CP23-492)”. Florida Gas Transmission Company, LLC (filed with FERC). 23 May 2024. Retrieved 3 October 2026.
- “Monthly Status Report No. 2 (July 2024), South Louisiana Project (CP23-492)”. Florida Gas Transmission Company, LLC (filed with FERC). 20 August 2024. Retrieved 3 October 2026.