Florida Southeast Connection
From the ProvenHand pipeline wiki
Florida Southeast Connection is a natural gas pipeline in Florida, operated by NextEra Energy. It entered service in 2017. It runs 126 miles of 36", 30" pipe.[1]
| Florida Southeast Connection | |
|---|---|
| Also called | FSC, Southeast Connection, Florida Southeast Connector |
| General information | |
| Commodity | Natural gas |
| Operator | NextEra Energy |
| State | Florida |
| In service | 2017 |
| Contractors |
|
| Technical information | |
| Length | 126 mi |
| Pipe size | 36", 30" |
| On ProvenHand | |
| Hands listed | 0 |
Florida Southeast Connection is a natural gas pipeline in Florida, operated by NextEra Energy. It entered service in 2017. It runs 126 miles of 36", 30" pipe.[1]
Contractorsedit
| Contractor | Scope |
|---|---|
| Rockford Corporation[2] | Whole line: 77 mi of 36-inch and 49 mi of 30-inch |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Florida Southeast Connection? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- cms.ferc.gov · 20180530190116-CP17-463-000.pdf
- prim.com · Pipeline_Rockford_NextEra_Florida-Southe
- eia.gov
- eia.gov · EIA-NaturalGasPipelineProjects.xlsx
This pipeline article is a stub. You can help ProvenHand by expanding it.