Freeport LNG Train 4
From the ProvenHand pipeline wiki
Freeport LNG Train 4 is a facility project at Freeport LNG in Texas, operated by Freeport LNG Development, L.P. and FLNG Liquefaction 4, LLC.
| Freeport LNG Train 4 | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Status | Approved[1][2] |
| Owners and operators | |
| Facility | Freeport LNG[1] |
| State | Texas[1] |
| Approved | 17 May 2019[4] |
| FERC docket | CP17-470[1] |
| FERC pre-filing docket | PF15-25[3] |
| Doe lng docket | 18-26-LNG[5] |
| Technical information | |
| Capacity added | 0.74 Bcfd (FERC LNG map, Sep 2026)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Freeport LNG Train 4 is a facility project at Freeport LNG in Texas, operated by Freeport LNG Development, L.P. and FLNG Liquefaction 4, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Freeport LNG Train 4? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: U.S. LNG export terminals (as of September 22, 2026)”. Federal Energy Regulatory Commission. 22 September 2026. Retrieved 3 October 2026.
- “Request for extension of time until December 1, 2031, Freeport LNG Train 4 Project (CP17-470)”. Freeport LNG Development, L.P. et al. (filed with FERC). 18 June 2025. Retrieved 4 October 2026.
- “FERC eLibrary docket CP17-470”. Federal Energy Regulatory Commission. 29 June 2017. Retrieved 3 October 2026.
- “Order Granting Authorization under Section 3 of the Natural Gas Act, Freeport LNG Train 4 Project (CP17-470)”. Federal Energy Regulatory Commission. 17 May 2019. Retrieved 4 October 2026.
- “DOE: Long Term Applications Received by DOE to Export Domestically Produced LNG, CNG, CGL from the Lower-48 States (as of September 30, 2026)”. U.S. Department of Energy, Office of Fossil Energy and Carbon Management. 30 September 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.