Gabbs Lateral Naval Air Station Fallon Relocation Project
From the ProvenHand pipeline wiki
Gabbs Lateral Naval Air Station Fallon Relocation Project is a pipeline lateral in Nevada, operated by Great Basin Gas Transmission Company. It runs 32.6 miles of 6", 8" pipe.
| Gabbs Lateral Naval Air Station Fallon Relocation Project | |
|---|---|
| Also called | Gabbs Lateral NASF Relocation Project[1], Gabbs Lateral FNAS Relocation Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | Approved[2] |
| Owner and operator | |
| State | Nevada[3] |
| Counties | Mineral, Nye[2] |
| Approved | 23 June 2026[2][3] |
| FERC docket | CP25-551[1] |
| FERC pre-filing docket | PF24-6[1] |
| Technical information | |
| Length | 32.6 mi[2][3] |
| Pipe size | 6", 8"[2] |
| Cost | approximately $83,755,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Gabbs Lateral Naval Air Station Fallon Relocation Project is a pipeline lateral in Nevada, operated by Great Basin Gas Transmission Company. It runs 32.6 miles of 6", 8" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gabbs Lateral Naval Air Station Fallon Relocation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-551”. Federal Energy Regulatory Commission. 29 September 2025. Retrieved 3 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Gabbs Lateral Relocation Project (CP25-551)”. Federal Energy Regulatory Commission. 23 June 2026. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.