Gas Transmission Northwest A-Line Hydrotest Project

From the ProvenHand pipeline wiki

Gas Transmission Northwest A-Line Hydrotest Project is a natural gas pipeline in Idaho, operated by Gas Transmission Northwest LLC. Construction began in 2022.

Gas Transmission Northwest A-Line Hydrotest Project
General information
KindPipeline project[1]
CommodityNatural gas[2]
Owner and operator
StateIdaho[2]
CountiesBonner, Boundary[2]
Construction started6 April 2022[3]
FERC docketCP22-27[1]
Contractors
Technical information
Costapproximately $22 million[2]
On ProvenHand
Hands listed0

Gas Transmission Northwest A-Line Hydrotest Project is a natural gas pipeline in Idaho, operated by Gas Transmission Northwest LLC. Construction began in 2022.

Contractorsedit

ContractorWork
Associated Pipeline[4]Hydrotest

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Gas Transmission Northwest A-Line Hydrotest Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP22-27”. Federal Energy Regulatory Commission. 6 December 2021. Retrieved 3 October 2026.
  2. “Notice of Request Under Blanket Authorization, Gas Transmission Northwest LLC (CP22-27)”. Federal Energy Regulatory Commission. 15 December 2021. Retrieved 4 October 2026.
  3. “Weekly Status Report No. 1, GTN A-Line Hydrotest Project (CP22-27)”. Gas Transmission Northwest LLC (filed with FERC). 13 April 2022. Retrieved 4 October 2026.
  4. “Weekly Construction Status Report, GTN A-Line Hydrotest Project (CP22-27), filed 2022-05-25”. Gas Transmission Northwest LLC (filed with FERC). 25 May 2022. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.