Gas Transmission Northwest A-Line Hydrotest Project is a natural gas pipeline in Idaho, operated by Gas Transmission Northwest LLC. Construction began in 2022.
| Gas Transmission Northwest A-Line Hydrotest Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Idaho[2] |
| Counties | Bonner, Boundary[2] |
| Construction started | 6 April 2022[3] |
| FERC docket | CP22-27[1] |
| Contractors | |
| Technical information | |
| Cost | approximately $22 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Gas Transmission Northwest A-Line Hydrotest Project is a natural gas pipeline in Idaho, operated by Gas Transmission Northwest LLC. Construction began in 2022.
Contractorsedit
| Contractor | Work |
|---|---|
| Associated Pipeline[4] | Hydrotest |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gas Transmission Northwest A-Line Hydrotest Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP22-27”. Federal Energy Regulatory Commission. 6 December 2021. Retrieved 3 October 2026.
- “Notice of Request Under Blanket Authorization, Gas Transmission Northwest LLC (CP22-27)”. Federal Energy Regulatory Commission. 15 December 2021. Retrieved 4 October 2026.
- “Weekly Status Report No. 1, GTN A-Line Hydrotest Project (CP22-27)”. Gas Transmission Northwest LLC (filed with FERC). 13 April 2022. Retrieved 4 October 2026.
- “Weekly Construction Status Report, GTN A-Line Hydrotest Project (CP22-27), filed 2022-05-25”. Gas Transmission Northwest LLC (filed with FERC). 25 May 2022. Retrieved 4 October 2026.