Gateway Extension Project
From the ProvenHand pipeline wiki
Gateway Extension Project is a natural gas pipeline in West Virginia, operated by Eastern Gas Transmission and Storage, Inc.. It entered service in 2025. It runs 3.1 miles of 30" pipe.
| Gateway Extension Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | West Virginia[1] |
| Counties | Doddridge[3] |
| Approved | 14 December 2017[1] |
| In service | 23 October 2025[2] |
| FERC docket | CP24-521[3] |
| West Virginia stormwater permit | WVR310846[1] |
| Technical information | |
| Length | 3.1 mi[3] |
| Pipe size | 30"[3] |
| Capacity added | 90,000 dekatherms per day[3] |
| Cost | $34,380,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Gateway Extension Project is a natural gas pipeline in West Virginia, operated by Eastern Gas Transmission and Storage, Inc.. It entered service in 2025. It runs 3.1 miles of 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gateway Extension Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “WVDEP: Oil and Gas Construction Stormwater registrations”. West Virginia Department of Environmental Protection. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 74, Gateway Extension Project (CP24-521)”. Eastern Gas Transmission and Storage, Inc. (filed with FERC). 15 May 2026. Retrieved 3 October 2026.
- “Environmental Assessment Report, Sections 157.205(b), 157.208(b) and 157.210, Gateway Extension Project (CP24-521)”. Federal Energy Regulatory Commission. 22 November 2024. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.