Gator Express Pipeline (Phase 2)
From the ProvenHand pipeline wiki
Gator Express Pipeline (Phase 2) is a natural gas pipeline lateral in Louisiana, operated by Venture Global Gator Express, LLC. It entered service in 2024. It runs 12 miles of 42" pipe.
| Gator Express Pipeline (Phase 2) | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Louisiana[1] |
| In service | 27 March 2024[1] |
| FERC docket | CP17-67[1] |
| Technical information | |
| Length | 12 mi[1] |
| Pipe size | 42"[1] |
| Capacity | 1970 MMcf/d additional capacity (EIA)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Gator Express Pipeline (Phase 2) is a natural gas pipeline lateral in Louisiana, operated by Venture Global Gator Express, LLC. It entered service in 2024. It runs 12 miles of 42" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gator Express Pipeline (Phase 2)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.