Gettysburg Compressor Station Replacement
From the ProvenHand pipeline wiki
Gettysburg Compressor Station Replacement is a facility project in Pennsylvania, operated by Columbia Gas Transmission, LLC.
| Gettysburg Compressor Station Replacement | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[2] |
| Status | Approved[1] |
| Owner and operator | |
| State | Pennsylvania[3] |
| Counties | Adams[3] |
| FERC docket | CP13-543[2] |
| Technical information | |
| Units added | 1 × Solar Centaur 40-4700S (4,700 hp each)[3] |
| Cost | $22.4 M[3] |
| On ProvenHand | |
| Hands listed | 0 |
Gettysburg Compressor Station Replacement is a facility project in Pennsylvania, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gettysburg Compressor Station Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Advance notification of natural gas facility replacement (Section 2.55(b)), Gettysburg Compressor Station Replacement (CP13-543)”. Columbia Gas Transmission, LLC (filed with FERC). 6 September 2013. Retrieved 4 October 2026.
- “FERC eLibrary docket CP13-543”. Federal Energy Regulatory Commission. 6 September 2013. Retrieved 3 October 2026.
- “Environmental Assessment Report, Gettysburg Compressor Station Replacement (CP13-543)”. FERC. 20 September 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.