Gillis Access Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Gillis Access Project is a natural gas pipeline in Louisiana, operated by TC Energy. It runs 42 miles of 36" pipe.[1]

Gillis Access Project
Also calledGillis Access
General information
Project typeNew build[2] or Replacement[3][sources disagree]
StatusIn service[2][4]
CommodityNatural gas[2]
Operator
Owner and operator
StateLouisiana[2]
CountiesBeauregard, Calcasieu, Jefferson Davis[5]
In service15 February 2024[2] or March 2024[4][sources disagree]
FERC docketCP23-512[3]
Technical information
Length42 mi[2]
Pipe size36"[5]
Capacity1500 MMcf/d additional capacity (EIA)[2] or 1.5 Bcf/d[6][sources disagree]
Cost$400 million (EIA estimate; no dollar year given)[2] or approximately US$0.3 billion (stated when placed in service)[4][sources disagree]
On ProvenHand
Hands listed0

Gillis Access Project is a natural gas pipeline in Louisiana, operated by TC Energy. It runs 42 miles of 36" pipe.[1]

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1500 MMcf/d additional capacity (EIA)[2]
  • 1.5 Bcf/d[6]
Project type
Cost
  • $400 million (EIA estimate; no dollar year given)[2]
  • approximately US$0.3 billion (stated when placed in service)[4]
In service
  • 15 February 2024[2]
  • March 2024[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Gillis Access Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. tcenergy.com
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP23-512”. Federal Energy Regulatory Commission. 14 July 2023. Retrieved 3 October 2026.
  4. “TC Energy first-quarter 2024 report to shareholders (6-K exhibit 99.1)”. TC Energy Corporation (SEC filing). 3 May 2024. Retrieved 4 October 2026.
  5. “Advance Notification of Construction of Facilities under 18 CFR 284.11(b), Gillis Access Project (CP23-512)”. TC Louisiana Intrastate Pipeline LLC (filed with FERC). 14 July 2023. Retrieved 4 October 2026.
  6. “TC Energy third-quarter 2022 report to shareholders (6-K exhibit 99.1)”. TC Energy Corporation (SEC filing). 9 November 2022. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.