Gillis West Expansion Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Gillis West Expansion Project is a natural gas pipeline expansion in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC.
| Gillis West Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1][2] |
| Status | Proposed[2] or Under construction[3][sources disagree] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Louisiana[2] |
| Counties | Louisiana: Allen, Beauregard Texas: Harris[4] |
| FERC docket | CP26-218[1] |
| Technical information | |
| Capacity | 115 MMcf/d additional capacity (EIA)[2] |
| Capacity added | 115,000 dekatherms per day[4] |
| Cost | $28,700,000[4] |
| On ProvenHand | |
| Hands listed | 0 |
Gillis West Expansion Project is a natural gas pipeline expansion in Louisiana, operated by Transcontinental Gas Pipe Line Company, LLC.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gillis West Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-218”. Federal Energy Regulatory Commission. 15 April 2026. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Transcontinental Gas Pipe Line Company, LLC submits Weekly Construction Status Report No. 8 for the period of 09/21/2026 to 09/27/2026 re the Gillis West Expansion Project under CP26-218.”. Transcontinental Gas Pipe Line Company, LLC (filed with FERC). 2 October 2026. Retrieved 3 October 2026.
- “Environmental Assessment Report for Transcontinental Gas Pipe Line Company, LLC's Section 157.205, 157.208(b), 157.210, 157.211(b) –Prior Notice Filing– Mainline Natural Gas Facilities under CP26-218.”. Federal Energy Regulatory Commission (staff document). 26 June 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.