GLT St Clair Looping
From the ProvenHand pipeline wiki
GLT St Clair Looping is a natural gas pipeline expansion in Michigan. It entered service in 1996. It runs 0.2 miles of 36" pipe.
| GLT St Clair Looping | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| State | Michigan[1] |
| In service | 8 November 1996[1] |
| FERC docket | CP96-26[1] |
| Technical information | |
| Length | 0.2 mi[1] |
| Pipe size | 36"[1] |
| Capacity | 50 MMcf/d additional capacity (EIA)[1] |
| Cost | $3.9 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
GLT St Clair Looping is a natural gas pipeline expansion in Michigan. It entered service in 1996. It runs 0.2 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on GLT St Clair Looping? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.