Golden Pass LNG Bidirectional Pipeline

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Golden Pass LNG Bidirectional Pipeline is a natural gas pipeline expansion, operated by Golden Pass Pipeline LLC. It entered service in 2026.

Golden Pass LNG Bidirectional Pipeline
Also calledGolden Pass Terminal Expansion Project[1]
General information
KindPipeline project[2]
Project typeExpansion[3]
StatusIn service[3]
CommodityNatural gas[3]
Owner and operator
StateTX[2] or LA, TX[3][sources disagree]
Approved21 December 2016[2]
In service27 January 2026[3]
FERC docketCP14-518[2]
FERC pre-filing docketPF13-14[2]
Technical information
Length3 mi[2] or 69 mi[3][sources disagree]
Pipe size42"[3]
Capacity2500 MMcf/d (FERC project list)[2][3]
Cost$383 million (EIA estimate; no dollar year given)[3]
On ProvenHand
Hands listed0

Golden Pass LNG Bidirectional Pipeline is a natural gas pipeline expansion, operated by Golden Pass Pipeline LLC. It entered service in 2026.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Golden Pass LNG Bidirectional Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP14-518”. Federal Energy Regulatory Commission. 7 July 2014. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.