Grasslands South Expansion Project
From the ProvenHand pipeline wiki
Grasslands South Expansion Project is a natural gas pipeline in Montana, North Dakota and Wyoming, operated by WBI Energy Transmission, Inc.. It was built and entered service in 2023. It runs 15.3 miles of 12" pipe.
| Grasslands South Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] or Lateral[2][sources disagree] |
| Status | In service[2][3] |
| Commodity | Natural gas[2][4] |
| Owner and operator | |
| States | Montana, North Dakota, Wyoming[2] |
| Counties | North Dakota: Dunn Wyoming: Campbell, Sheridan[5] |
| Construction started | April 2023[6] |
| In service | 21 December 2023[2] |
| FERC docket | CP23-35[1] |
| Technical information | |
| Length | 15.3 mi[2] |
| Pipe size | 12"[2] |
| Capacity | 94 MMcf/d additional capacity (EIA)[2] |
| Capacity added | 94,000 dekatherms per day of firm capacity[5] |
| Cost | $30.7 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Grasslands South Expansion Project is a natural gas pipeline in Montana, North Dakota and Wyoming, operated by WBI Energy Transmission, Inc.. It was built and entered service in 2023. It runs 15.3 miles of 12" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Grasslands South Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-35”. Federal Energy Regulatory Commission. 22 December 2022. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Weekly Status Report No. 36, final (Dec 2023), Grasslands South Expansion Project (CP23-35)”. WBI Energy Transmission, Inc. (filed with FERC). 21 December 2023. Retrieved 4 October 2026.
- “Environmental Assessment Report, Grasslands South Expansion Project (CP23-35)”. FERC. 27 February 2023. Retrieved 4 October 2026.
- “Grasslands South Expansion project page”. WBI Energy (Wayback capture 2023-03-26). 26 March 2023. Archived from the original on 26 March 2023. Retrieved 4 October 2026.
- “Weekly Status Report No. 1 (April 2023), Grasslands South Expansion Project (CP23-35)”. WBI Energy Transmission, Inc. (filed with FERC). 20 April 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.