Great Basin Gas Transmission 2023 Mainline Replacement Project
From the ProvenHand pipeline wiki
Great Basin Gas Transmission 2023 Mainline Replacement Project is a natural gas pipeline replacement in Nevada, operated by Great Basin Gas Transmission Company. Construction began in 2023. It runs 20.4 miles of 16" pipe.
| Great Basin Gas Transmission 2023 Mainline Replacement Project | |
|---|---|
| Also called | 2023 Mainline Replacement Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Replacement[1][2][3] |
| Status | In service[1][4] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Nevada[1] |
| Counties | Humboldt[3] |
| Approved | 16 February 2023[3] |
| Construction started | 1 August 2023[5] |
| In service | 31 March 2024[1] or 25 April 2024[4][sources disagree] |
| FERC docket | CP22-141[2] |
| Contractors | |
| Technical information | |
| Length | 20.4 mi[1][3] |
| Pipe size | 16"[1][3] |
| Cost | $47.1 million (EIA estimate; no dollar year given)[1] or $47,119,897 estimated (certificate order)[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Great Basin Gas Transmission 2023 Mainline Replacement Project is a natural gas pipeline replacement in Nevada, operated by Great Basin Gas Transmission Company. Construction began in 2023. It runs 20.4 miles of 16" pipe.
Contractorsedit
| Contractor | Work | Scope | Spread | Years |
|---|---|---|---|---|
| Arizona Pipeline Company[5] | Prime | Great Basin's construction contractor for the mainline replacement (clearing through hydrotest and restoration) | Mainline replacement spread (single spread) | from 1 August 2023 |
| Stantec Consulting Services Inc.[6] | Environmental surveys and training | Great Basin's environmental contractor: environmental training for construction workers and migratory bird and burrowing owl surveys ahead of clearing |
Spreads
| Spread | Prime contractor | Dates |
|---|---|---|
| Mainline replacement spread (single spread)[5][7][8] | Arizona Pipeline Company | from 1 August 2023 |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Great Basin Gas Transmission 2023 Mainline Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP22-141”. Federal Energy Regulatory Commission. 30 March 2022. Retrieved 3 October 2026.
- “Order Issuing Certificate and Approving Abandonment, 2023 Mainline Replacement Project (CP22-141)”. Federal Energy Regulatory Commission. 16 February 2023. Retrieved 3 October 2026.
- “Notification of Placement into Service, 2023 Mainline Replacement Project (CP22-141)”. Great Basin Gas Transmission Company (filed with FERC). 6 May 2024. Retrieved 3 October 2026.
- “Biweekly Construction Progress Report No. 8 (Jul 31 to Aug 13, 2023), 2023 Mainline Replacement Project (CP22-141)”. Great Basin Gas Transmission Company (filed with FERC). 8 September 2023. Retrieved 3 October 2026.
- “Biweekly Construction Progress Report No. 10 (Aug 28 to Sep 10, 2023), 2023 Mainline Replacement Project (CP22-141)”. Great Basin Gas Transmission Company (filed with FERC). 29 September 2023. Retrieved 3 October 2026.
- “Environmental Assessment, 2023 Mainline Replacement Project (CP22-141)”. Federal Energy Regulatory Commission. 10 November 2022. Retrieved 3 October 2026.
- “Biweekly Construction Progress Report No. 7 (Jul 17 to Jul 30, 2023), 2023 Mainline Replacement Project (CP22-141)”. Great Basin Gas Transmission Company (filed with FERC). 21 August 2023. Retrieved 3 October 2026.