Great Basin Gas Transmission 2024 Expansion Project
From the ProvenHand pipeline wiki
Great Basin Gas Transmission 2024 Expansion Project is a natural gas pipeline expansion in Nevada, operated by Great Basin Gas Transmission Company. Construction began in 2024 and the line entered service in 2025. It runs 3.4 miles of 12", 20" pipe.
| Great Basin Gas Transmission 2024 Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1][2] |
| Status | In service[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Nevada[4] |
| Counties | Douglas, Lyon, Storey[2][5] |
| Approved | 25 April 2024[2][4] |
| Construction started | 10 September 2024[6] |
| In service | 18 November 2025[3] |
| FERC docket | CP23-466[1] |
| Contractors | |
| Technical information | |
| Length | 3.4 mi[3][4][5] |
| Pipe size | 12", 20"[2] |
| Capacity | 5.67 MMcf/d (FERC project list)[4] |
| Cost | $10,941,817 actual total project cost (final cost statement)[7] |
| On ProvenHand | |
| Hands listed | 0 |
Great Basin Gas Transmission 2024 Expansion Project is a natural gas pipeline expansion in Nevada, operated by Great Basin Gas Transmission Company. Construction began in 2024 and the line entered service in 2025. It runs 3.4 miles of 12", 20" pipe.
Contractorsedit
| Contractor | Work | Scope | Spread | Years |
|---|---|---|---|---|
| Q&D Construction LLC[8] | Prime | Silver Springs Segment construction contract (awarded 2025-05-01); the May 2025 report also says its employees worked on the Kingsbury Segment in 2024 | Silver Springs Segment | from 1 May 2025 |
Spreads
| Spread | Prime contractor | Dates |
|---|---|---|
| Kingsbury Segment[2][6] | from 10 September 2024 | |
| Silver Springs Segment[2][5][8] | Q&D Construction LLC | from 15 May 2025 |
| Truckee Canal Segment[2][5][9] | from 4 February 2025 |
Crossings
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Great Basin Gas Transmission 2024 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-466”. Federal Energy Regulatory Commission. 1 May 2023. Retrieved 3 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Great Basin Gas Transmission Company (187 FERC 61,043)”. FERC. 25 April 2024. Retrieved 3 October 2026.
- “Notification of Placement into Service, 2024 Expansion Project (CP23-466)”. Great Basin Gas Transmission Company (filed with FERC). 10 December 2025. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Great Basin 2024 Expansion Project overview (operator project site)”. Great Basin Gas Transmission Company. Retrieved 3 October 2026.
- “Biweekly Status Report No. 6 (Sept 1 to Sept 14, 2024), 2024 Expansion Project (CP23-466)”. Great Basin Gas Transmission Company (filed with FERC). 26 September 2024. Retrieved 3 October 2026.
- “Statement Comparing Estimated and Actual Costs of Authorized Facilities, 2024 Expansion Project (CP23-466)”. Great Basin Gas Transmission Company (filed with FERC). 4 May 2026. Retrieved 3 October 2026.
- “Biweekly Construction Status Report (Silver Springs Segment contract award), 2024 Expansion Project (CP23-466)”. Great Basin Gas Transmission Company (filed with FERC). 30 May 2025. Retrieved 3 October 2026.
- “Biweekly Construction Status Report (Truckee Canal Segment start), 2024 Expansion Project (CP23-466)”. Great Basin Gas Transmission Company (filed with FERC). 11 March 2025. Retrieved 3 October 2026.
- “Variance request, HDD bore on the Silver Springs Segment (MP CA-17.15 to CA-17.35), 2024 Expansion Project (CP23-466)”. Great Basin Gas Transmission Company (filed with FERC). 16 July 2025. Retrieved 3 October 2026.
- “Biweekly Construction Status Report (HDD reaming on the Silver Springs Segment), 2024 Expansion Project (CP23-466)”. Great Basin Gas Transmission Company (filed with FERC). 17 September 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.