Great Basin Gas Transmission 2026 Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Great Basin Gas Transmission 2026 Expansion Project is a natural gas pipeline expansion in Nevada, operated by Great Basin Gas Transmission Company. It runs 2.3 miles of 20" pipe.

Great Basin Gas Transmission 2026 Expansion Project
Also calledGreat Basin Expansion Project[1]
General information
KindPipeline project[2]
Project typeExpansion[1][2]
StatusProposed[1] or Approved[3][sources disagree]
CommodityNatural gas[1]
Owner and operator
StateNevada[1][4][5]
CountiesDouglas, Lyon, Washoe[3]
Approved12 May 2026[3][4]
FERC docketCP25-209[2]
Technical information
Length2.3 mi[4][5]
Pipe size20"[3]
Capacity8.13 MMcf/d (FERC project list)[4][5] or 800 MMcf/d additional capacity (EIA)[1][sources disagree]
Cost$1700 million (EIA estimate; no dollar year given)[1] or approximately $18,884,092[3][sources disagree]
On ProvenHand
Hands listed0

Great Basin Gas Transmission 2026 Expansion Project is a natural gas pipeline expansion in Nevada, operated by Great Basin Gas Transmission Company. It runs 2.3 miles of 20" pipe.

Inspection

FirmScope
Arcadis US, Inc.[6]environmental contractor (SHPO coordination, environmental training)

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 8.13 MMcf/d (FERC project list)[4][5]
  • 800 MMcf/d additional capacity (EIA)[1]
Cost
  • $1700 million (EIA estimate; no dollar year given)[1]
  • approximately $18,884,092[3]
Status

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Great Basin Gas Transmission 2026 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP25-209”. Federal Energy Regulatory Commission. 15 April 2025. Retrieved 3 October 2026.
  3. “Order Issuing Certificate and Granting Abandonment, Great Basin Gas Transmission Company, 2026 Expansion Project (CP25-209)”. Federal Energy Regulatory Commission. 12 May 2026. Retrieved 3 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
  6. “Biweekly Status Report No. 1 (07/21/2026 to 08/02/2026), 2026 Great Basin Expansion Project (CP25-209)”. Great Basin Gas Transmission Company (filed with FERC). 19 August 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.