GS Carthage to Keatchie Pipeline Loop
From the ProvenHand pipeline wiki
GS Carthage to Keatchie Pipeline Loop is a natural gas pipeline in Louisiana and Texas, operated by Gulf South Pipeline Company, LLC. It entered service in 2006. It runs 20.5 miles of 42" pipe.
| GS Carthage to Keatchie Pipeline Loop | |
|---|---|
| Also called | Carthage to Keatchie Pipeline Loop Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[2] or Loop[1][3][sources disagree] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Louisiana, Texas[2] |
| Counties | Louisiana: DeSoto Texas: Panola[3] |
| In service | 15 December 2006[2] |
| FERC docket | CP06-127[2] |
| Technical information | |
| Length | 20.5 mi[2][3] |
| Pipe size | 42"[2][3] |
| Capacity | 122.4 MMcf/d additional capacity (EIA)[2] |
| Capacity added | approximately 112,400 Dth per day of new pipeline capacity[4] |
| Cost | $47.9 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
GS Carthage to Keatchie Pipeline Loop is a natural gas pipeline in Louisiana and Texas, operated by Gulf South Pipeline Company, LLC. It entered service in 2006. It runs 20.5 miles of 42" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on GS Carthage to Keatchie Pipeline Loop? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP06-127”. Federal Energy Regulatory Commission. 14 April 2006. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Request Under Blanket Authorization, Gulf South Pipeline Company, LP (CP06-127)”. Federal Energy Regulatory Commission (notice). 25 April 2006. Retrieved 4 October 2026.
- “Staff notice withdrawing its protest to the Gulf South Pipeline prior notice request (CP06-127)”. Federal Energy Regulatory Commission (staff filing). 23 June 2006. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.