GTN XPress Project is a natural gas pipeline expansion in Idaho, Oregon and Washington, operated by Gas Transmission Northwest LLC. Construction began in 2024.

GTN XPress Project
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
Operator
Facility projects
StatesIdaho, Oregon, Washington[2][3]
CountiesIdaho: Kootenai
Oregon: Sherman

Washington: Walla Walla
[4]
Approved23 October 2023[3][4]
Construction started26 July 2024[5]
In serviceNovember 2024[2] or 13 December 2024[6][sources disagree]
FERC docketCP22-2[1]
Technical information
Capacity150 MMcf/d (FERC project list)[2][3]
Cost$335 million (EIA estimate; no dollar year given)[2] or $49,178,777.65 (final cost report, June 2026; Exhibit K estimate $75,138,690)[7][sources disagree]
On ProvenHand
Hands listed0

GTN XPress Project is a natural gas pipeline expansion in Idaho, Oregon and Washington, operated by Gas Transmission Northwest LLC. Construction began in 2024.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $335 million (EIA estimate; no dollar year given)[2]
  • $49,178,777.65 (final cost report, June 2026; Exhibit K estimate $75,138,690)[7]
In service
  • November 2024[2]
  • 13 December 2024[6]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on GTN XPress Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP22-2”. Federal Energy Regulatory Commission. 4 October 2021. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Order Issuing Certificate, Gas Transmission Northwest, LLC, GTN XPress Project (CP22-2)”. Federal Energy Regulatory Commission. 23 October 2023. Retrieved 3 October 2026.
  5. “Notice of Commencement of Construction, GTN XPress Project (CP22-2)”. Gas Transmission Northwest LLC (filed with FERC). 5 August 2024. Retrieved 3 October 2026.
  6. “Notice of Commencement of Service, Remaining Project Facilities and Capacity, GTN XPress Project (CP22-2)”. Gas Transmission Northwest LLC (filed with FERC). 18 December 2024. Retrieved 3 October 2026.
  7. “Final Cost Report, GTN XPress Project (CP22-2)”. Gas Transmission Northwest, LLC (filed with FERC). 30 June 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.