Gulf Coast Storage Expansion Project

From the ProvenHand pipeline wiki

Gulf Coast Storage Expansion Project is a pipeline expansion, operated by Natural Gas Pipeline Company of America LLC. Construction began in 2026. It runs 5.9 miles of 30" pipe.

Gulf Coast Storage Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusUnder construction[2]
Owner and operator
CountiesHarrison[3]
Approved4 December 2025[3]
Construction startedMarch 2026[2]
FERC docketCP25-52[1]
Technical information
Length5.9 mi[3]
Pipe size30"[3]
Horsepower added12,000 hp[3]
Costestimates the cost of the project to be $96,871,349[3]
On ProvenHand
Hands listed0

Gulf Coast Storage Expansion Project is a pipeline expansion, operated by Natural Gas Pipeline Company of America LLC. Construction began in 2026. It runs 5.9 miles of 30" pipe.

Inspection

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Gulf Coast Storage Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-52”. Federal Energy Regulatory Commission. 17 January 2025. Retrieved 3 October 2026.
  2. “Biweekly Report No. 1, Gulf Coast Storage Expansion Project (CP25-52)”. Natural Gas Pipeline Company of America LLC (filed with FERC). 20 March 2026. Retrieved 4 October 2026.
  3. “Order Issuing Certificate, Gulf Coast Storage Expansion Project (CP25-52)”. Federal Energy Regulatory Commission. 4 December 2025. Retrieved 4 October 2026.
  4. “Field Inspection Report, Gulf Coast Storage Expansion Project, inspected 2026-03-19 (CP25-52)”. Federal Energy Regulatory Commission. 6 April 2026. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.