Gulf Coast Storage Expansion Project
From the ProvenHand pipeline wiki
Gulf Coast Storage Expansion Project is a pipeline expansion, operated by Natural Gas Pipeline Company of America LLC. Construction began in 2026. It runs 5.9 miles of 30" pipe.
| Gulf Coast Storage Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | Under construction[2] |
| Owner and operator | |
| Counties | Harrison[3] |
| Approved | 4 December 2025[3] |
| Construction started | March 2026[2] |
| FERC docket | CP25-52[1] |
| Technical information | |
| Length | 5.9 mi[3] |
| Pipe size | 30"[3] |
| Horsepower added | 12,000 hp[3] |
| Cost | estimates the cost of the project to be $96,871,349[3] |
| On ProvenHand | |
| Hands listed | 0 |
Gulf Coast Storage Expansion Project is a pipeline expansion, operated by Natural Gas Pipeline Company of America LLC. Construction began in 2026. It runs 5.9 miles of 30" pipe.
Inspection
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gulf Coast Storage Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-52”. Federal Energy Regulatory Commission. 17 January 2025. Retrieved 3 October 2026.
- “Biweekly Report No. 1, Gulf Coast Storage Expansion Project (CP25-52)”. Natural Gas Pipeline Company of America LLC (filed with FERC). 20 March 2026. Retrieved 4 October 2026.
- “Order Issuing Certificate, Gulf Coast Storage Expansion Project (CP25-52)”. Federal Energy Regulatory Commission. 4 December 2025. Retrieved 4 October 2026.
- “Field Inspection Report, Gulf Coast Storage Expansion Project, inspected 2026-03-19 (CP25-52)”. Federal Energy Regulatory Commission. 6 April 2026. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.