Gulf LNG Pipeline
From the ProvenHand pipeline wiki
Gulf LNG Pipeline is a natural gas pipeline in Mississippi, operated by Gulf LNG Pipeline, LLC. It entered service in 2011. It runs 5 miles of 36" pipe.
| Gulf LNG Pipeline | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1][2] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Mississippi[1] |
| Approved | 16 February 2007[4] |
| In service | 22 September 2011[1] |
| FERC docket | CP06-12[1] |
| Technical information | |
| Length | 5 mi[1] |
| Pipe size | 36"[1] |
| Capacity | 1500 MMcf/d additional capacity (EIA)[1] |
| Cost | $10 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Gulf LNG Pipeline is a natural gas pipeline in Mississippi, operated by Gulf LNG Pipeline, LLC. It entered service in 2011. It runs 5 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gulf LNG Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Letter order granting authorization to commence service from the Gulf LNG import terminal (CP06-12 et al.)”. FERC (Office of Energy Projects). 26 September 2011. Retrieved 4 October 2026.
- “FERC eLibrary docket CP06-12”. Federal Energy Regulatory Commission. 28 October 2005. Retrieved 3 October 2026.
- “Order Granting Authority under Section 3 and Issuing Certificates, Gulf LNG Energy, LLC and Gulf LNG Pipeline, LLC (CP06-12, CP06-13, CP06-14)”. FERC. 16 February 2007. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.