Gulf South Southeast Expansion
From the ProvenHand pipeline wiki
Gulf South Southeast Expansion is a natural gas pipeline in Mississippi and Alabama, operated by Boardwalk Pipeline Partners (Gulf South Pipeline). Construction began in 2007 and the line entered service in 2008. It runs 111 miles of 42" pipe.[1]
| Gulf South Southeast Expansion | |
|---|---|
| Also called | Southeast Expansion, Gulf South Southeast Expansion Project |
| General information | |
| Commodity | Natural gas |
| Operator | Boardwalk Pipeline Partners (Gulf South Pipeline) |
| States | Mississippi, Alabama |
| Construction started | 2007 |
| In service | 2008 |
| Contractors |
|
| Technical information | |
| Length | 111 mi |
| Pipe size | 42" |
| On ProvenHand | |
| Hands listed | 0 |
Gulf South Southeast Expansion is a natural gas pipeline in Mississippi and Alabama, operated by Boardwalk Pipeline Partners (Gulf South Pipeline). Construction began in 2007 and the line entered service in 2008. It runs 111 miles of 42" pipe.[1]
Contractorsedit
| Contractor | Scope |
|---|---|
| Gregory & Cook[2] | Pipeline construction |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gulf South Southeast Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
This pipeline article is a stub. You can help ProvenHand by expanding it.